Walkthrough Was Recorded Before Renovations Began – Site Address is: 18722 59th Ave. NE, 98223
Most recently completed: Paving done. (10-28-2026)
Currently working on parking lot striping, signage, and landscaping.
The Lord has clearly opened the door with a MATA purchase of a building only 850 feet south of our current training facility and hangar. As our current facility is maxed out, this new facility is needed to expand the MATA ministry with student classrooms, administrative space, Bible studies, and other events. This new annex building is critical for our goal of receiving international missionary flight students starting as soon as possible.
Even after the purchase was completed in April 2025, MATA is unable to use or do ministry in this newly acquired annex until the required renovations are completed. You’re invited to partner in God’s Kingdom work through mission aviation through prayer and funds.
Please click the provided link on this page to make your donation. Contributions can be made online with Credit or Debit Cards or Bank Transactions. Or mail check to: Mission Aviation Training Academy. PO Box 3655, Arlington, WA 98223.
Thank you for partnering with us in our passion for equipping and training evangelical Christian pilots for mission aviation ministry.
Contributions are made with the understanding that Mission Aviation Training Academy (MATA) has complete control and administration over the use of the donated funds. No goods or services were given or provided for this donation. 501(c)3 Tax ID: 91-1932500
Washington – The registration is on file with the Secretary of State’s Charities Program. Additional financial and other information is available from the Secretary of State at www.sos.wa.gov/charities.
1. COMPLETED: Existing Building Purchased – (April 2025)
2. COMPLETED: Airport Land Leased for 50 years. – (April 2025)
3. COMPLETED: Type 1 Architecturals. – (August 2026)
4. PERMIT RECEIVED FOR OUTSIDE WORK – (August 2026)
5. COMPLETED: Hookup to Sewer- (October 2026)
6. COMPLETED: Parking Lots Paving (October 2026)
7. Parking Lot Striping and Signage.
8. Landscaping.
9. Permit determination for Interior Work.
10. New Windows & Doors + Installation.
11. New Siding Installation.
12. New HVAC. (This step is funded. Thank you.)
!!! MORE FUNDS NEEDED TO BEGIN THESE NEXT STEPS
13. Update Plumbing.
14. New Insulation & Wallboard.
15. Painting Interior.
16. New Flooring.